CULPEPER – The public is invited to learn more and comment on a proposed project to replace the Route 624 (Beazley Road) bridge over Blue Run in Greene County.
An in-person design public hearing will be held:
Tuesday, Oct. 13, 2026*
5-7 p.m.
Greene County Library
222 Main Street, Suite 101, Stanardsville, VA 22973
*In the event a backup date is needed, the hearing will be held from 3:30-5:30 p.m. on Wednesday, Oct. 21, 2026, at the same location.
Stop by the public hearing anytime between 5-7 p.m. to review project displays and discuss questions with Virginia Department of Transportation (VDOT) staff. The meeting will be held in an open house format.
The public can also view public hearing materials on the project web page.
Comments on the project will be accepted at the public hearing and afterward through Friday, Oct. 23, 2026.
Comments may be emailed to abreham.andarge@vdot.virginia.gov. Please reference "Route 624 (Beazley Road) bridge replacement” in the email subject line.
Comments may also be submitted by mailing them to Abreham Andarge, VDOT project manager, 1601 Orange Road, Culpeper, VA 22701.
Project background
The proposed $5.7 million project will replace the existing Route 624 (Beazley Road) bridge over Blue Run with a new single-span, prestressed concrete deck bridge with an asphalt riding surface. The new bridge will provide two travel lanes, shoulders that meet current road-design standards and concrete railings along both sides.
The existing bridge was built in 1932 and is located just west of Route 623 (Swift Run Road). It carries approximately 260 vehicles per day and is currently posted with a 28-ton weight restriction for single trucks and a 40-ton restriction for semi-trailer trucks. The replacement will remove those restrictions and allow all legal-weight vehicles to use the bridge.
During construction, Beazley Road will be closed to through traffic. An approximately 3.8-mile detour will be in place, and access to all properties will be maintained.
The project is expected to be advertised for construction in fall 2028, with work beginning in spring 2029. Construction is expected to be completed in spring 2030.
This content is sourced from
Virginia Department of Transportation (VDOT)
. It reflects the author's views and has not been edited by our newsroom. It may have been generated using AI assistance.