I-95 southbound
Exit 126 (Spotsylvania)
Sunday-Thursday, 8 p.m.-7 a.m., and Friday-Saturday, 9 p.m.-6 a.m. Single-lane closures near the interchange to mile marker 128 start at 8 p.m. Sunday through Thursday and 9 p.m. on Friday, followed by double-lane closures at 10 p.m. for sound wall panel installation. All southbound lanes will reopen at 5 a.m. except on Saturday when all lanes will reopen at 6 a.m.
Caroline County
Route 1
Monday-Friday, 9 a.m.-3 p.m. Right lane closures on Route 1 between Ladysmith Road and Route 207 (Rogers Clark Boulevard). Utility work under permit.
Route 1
Monday-Friday, 9 a.m.-3:30 p.m. Pavement marking. Mobile alternating lane closures along Route 1 in Caroline County.
People are also reading…
Route 30
Monday-Friday, 9 a.m.-3:30 p.m. Pavement marking. Mobile alternating closures between the Hanover County line and Route 652 (Signboard Road).
Route 301
Sunday-Thursday, 8 p.m.-6 a.m. Alternating lane closures for milling and paving on Route 301 between Moores Mill Road and the Mattaponi River bridge, and between Moores Mill Road and the Reedy Creek bridge.
Route 207 (Rogers Clark Boulevard), Route 207 Business
Monday-Friday, 9 a.m.-3:30 p.m. Pavement marking. Alternating lane closures at various locations on Route 207 northbound and southbound.
Route 639 (Ladysmith Road)
Monday-Friday, 9 a.m.-3 p.m. Single-lane closure with one-way, alternating traffic directed by a flagging crew between Route 1 and Partlow Road. Fiber installation under permit.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 207 over Polecat Creek
- Route 207 over Mattaponi River
- Route 207 over I-95
- Route 207 over Route 301
- Route 301 over Polecat Creek
- Route 301 over Rappahannock River
- Route 601 over I-95
- Route 605 over I-95
- Route 626 over Mattaponi River
- Route 632 over I-95
- Route 639 over I-95
- Route 647 over Mattaponi River
- Route 652 over I-95
- Route 722 over Mattaponi River
Pavement markings
Monday-Friday, 9 a.m.-3:30 p.m. Mobile operation to apply pavement markings on the following routes:
- Route 17
- Route 301
- Route 604
- Route 606
- Route 619
- Route 630
- Route 640
- Route 656
- Route 684
- Route 692
- Route 695
- Route 712
- Route 721
- Route 722
- Route 738
- Route 745
- Route 782
- Route 799
- Route 1070
- Frontage Road 814
City of Fredericksburg
Route 1
Wednesday-Friday, 9 a.m.-1:30 p.m. and Wednesday-Friday, 7 p.m.-6 a.m. Alternating lane closures on Route 1 northbound and southbound between Snowden Street and Thornton Street for construction to improve the Route 1 and Augustine Avenue intersection.
City of Fredericksburg and Stafford County
Route 1 over Rappahannock River (Falmouth Bridge)
Monday-Saturday, 7 p.m.-6 a.m. Mobile operation with single-lane closures to clean and wash the bridge to remove debris.
Essex County
Route 17 southbound
Monday-Friday, 9 a.m.-3:30 p.m. Guardrail repair. Right lane closure near Route 710.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:
- Route 17 over Piscataway Creek
- Route 17 over Occupacia Creek
- Route 17 over Mount Landing Creek
- Route 360 over Piscataway Creek
- Route 637 over Occupacia Creek
Pavement markings
Wednesday, 7 a.m.-7 a.m. Mobile operation to apply pavement markings on various low-volume secondary routes in the county.
Gloucester County
Route 17
Sunday-Thursday, 7 p.m.-5 a.m. Temporary pavement marking, in connection with milling and paving. Alternating lane closures between Main Street and Farys Mill Road, between Farys Mill Road and Meredith Drive, and between Belroi Road and Fiddlers Green Road.
Route 17 northbound
Sunday-Friday, 9 p.m.-8 a.m. Single-lane closure between Route 17 (Main Street) and Route 1024 (Beehive Drive).
Route 17 southbound
Sunday-Friday, 6 p.m.-5 a.m. Single-lane closure between Route 17 (Main Street) and Route 1024 (Beehive Drive).
Route 33
Sunday-Monday, 7 p.m.-5 a.m. Mobile operation to apply pavement markings between the King and Queen County line and Route 17.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 3 over Cow Creek
- Route 198 over Harpers Creek
- Route 641 over Northwest Branch Sarah Creek
Secondary road resurfacing
Monday-Friday, 7 a.m.-7 p.m. Alternating lane closures on various secondary routes for road resurfacing. A flagging crew will direct traffic.
King George County
Route 3
Monday-Thursday, 9 a.m.-3:30 p.m. and 8 p.m.-5 a.m. Milling and paving with alternating lane closures between Comorn Road and the Westmoreland County line.
Route 205
Monday-Friday, 9 a.m.-3:30 p.m. Guardrail installation. Single-lane closure between Route 3 and Route 301. Flaggers will alternate one-way traffic through the work zone.
Route 218 (Caledon Road)
Sunday-Thursday, 9 p.m.-5 a.m. Repairs to bridge at Machodoc Creek. Single-lane closure between Route 205 and Route 301. Flaggers will alternate one-way traffic through the work zone.
Route 716 (Foxes Way)
Sunday-Monday, 8 p.m.-5 a.m. Milling and paving with alternating lane closures between Route 3 and a cul-de-sac.
Pavement markings
Wednesday-Thursday, 7 a.m.-7 a.m. Mobile operation to apply pavement markings on various low-volume secondary routes in the county, including Route 628, Route 667 and Route 1000.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers should expect lane closures at the following locations:
- Route 3 over Birchwood Creek
- Route 218 over Machodoc Creek
- Route 218 over RF&P railroad abandoned tracks
- Route 301 over Williams Creek
- Route 301 over Machodoc Creek
- Route 625 over Guicatic Creek
King and Queen County
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 14 over Heartquake Creek
- Route 360 over Mattaponi River at Aylett
- Route 360 over Mattaponi River
- Route 627 over Maracossic Creek
- Route 721 over Chapel Hill Swamp
King William County
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:
- Route 360 over Pamunkey River
- Route 360 over Moncuin Creek
- Route 360 over Aylett Creek
- Route 615 over Pamunkey River
- Route 618 over Moncuin Creek
- Route 629 over Acquinton Creek
- Route 632 over Cohoke Mill Pond Spillway
- Route 701 over pond
Secondary road resurfacing
Monday-Friday, 7 a.m.-7 p.m. Alternating lane closures on various secondary routes for road resurfacing.
Lancaster County
Route 695 (Windmill Point Road)
Monday-Friday, 7 a.m.-7 p.m. Alternating lane closures with flagging as crews begin work to replace the bridge over Oyster Creek near Route 3.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 a.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 3 over Bellwood Run
- Route 3 over West Branch Corrotoman River
- Route 200 over Carters Creek
Pavement markings
Thursday, 7 a.m.-7 a.m. Mobile operation to apply pavement markings on various low-volume secondary routes in the county.
Lancaster County and Middlesex County
Route 3 over the Rappahannock River (Norris Bridge)
Monday-Saturday, 7 p.m.-6 a.m. Bridge cleaning with alternating one-way traffic overnight through the work zone.
Tuesday, 9 a.m.-noon. Single-lane closure to make spot repair with alternating one-way traffic through the work zone.
Mathews County
Route 14 (John Clayton Memorial Highway)
Monday-Friday, 9 a.m.-3:30 p.m. Single-lane closure near Route 3 for guardrail installation.
Route 223 (Cricket Hill Road)
Tuesday-Wednesday, 9 a.m.-8 p.m. Alternating lane closures with flagging for pavement marking between the east end of the Gwynn's Island Bridge and Route 633 (Old Ferry Road), and between the west end of the Gwynn's Island Bridge and Route 198 (Buckley Hall Road). Drivers should anticipate extended delays, especially during bridge openings for marine traffic.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:
- Route 3 over Piankatank River
- Route 223 over Milford Haven
- Route 609 over Garden Creek Canal
Surface treatment
Thursday, 7 a.m.-7 p.m. Alternating lane closures with flagging for surface treatment on various secondary routes.
Middlesex County
Route 3
Monday-Tuesday, 9 a.m.-8 p.m. Mobile operation for pavement work between Route 33 and Healys Mill Road.
Route 17
Monday-Friday, 9 a.m.-3:30 p.m. Single-lane closure near Route 615 (Zion Branch Road) for guardrail installation.
Route 33
Monday-Tuesday, 9 a.m.-8 p.m. Mobile operation for pavement work between Irmas Lane and Timberneck Road.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 a.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:
- Route 17 over Dragon Run
- Route 227 over Urbanna Creek
- Route 603 over Dragon Run
Northumberland County
Route 605 (Balls Neck Road/Mount Olive Road)
Wednesday, 7 a.m.-7 p.m. Mobile operation to apply pavement markings near Route 200.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 200 over Great Wicomico River
- Route 360 over Coan River
- Route 634 over Clark's Mill Pond
- Route 679 over Mill Creek
Richmond County
Route 3
Monday-Friday, 9 a.m.-3:30 p.m. Single-lane closure for guardrail installation near Route 608 (Farnham Creek Road). Flaggers will alternate one-way traffic through the work zone.
Route 360 (Richmond Road)
Monday-Friday, 7 a.m.-3:30 p.m. Single-lane closure on Route 360 eastbound for pavement repair between Route 619 (Mulberry Road) and Route 627 (Drinking Swamp).
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Travelers may encounter lane closures at the following locations:
- Route 3 over Totuskey Creek
- Route 620 over Little Totuskey Creek
- Route 623 over the Big Swamp
- Route 624 over Cat Point Creek
- Route 634 over Cat Point Creek
Richmond County and town of Tappahannock
Route 360 over Rappahannock River (Downing Bridge)
Monday-Saturday, 7 p.m.-6 a.m. Bridge cleaning. Single-lane closures.
Spotsylvania County
Route 1
Sunday-Thursday, 8 p.m.-6 a.m. Paving and trench widening to create a slightly wider road shoulder. Alternating lane closures between South Roxbury Mill Road and the Ni River bridge.
Route 1
Sunday-Thursday, 8 p.m.-5 a.m. Alternating lane closures between Crossing Court and Market Street for construction of I-95 exit 126 area improvements.
Route 1
Monday-Friday, 9 a.m.-3 p.m. Single-lane closures for median work under permit between Route 606 (Mudd Tavern Road) and Larkin Chew Road.
Route 1 northbound
Monday-Friday, 9 a.m.-3 p.m. Single-lane closure on northbound Route 1 between Ondura Drive and Guinea Station Road for waterline work under permit.
Route 1 southbound
Monday-Friday, 9 a.m.-3 p.m. Single-lane closure on Route 1 southbound between Massaponax Church Road and Ladysmith Road in Caroline County for fiber installation under permit.
Route 3 (Plank Road)
Monday-Thursday, 8 p.m.-6 a.m. Mobile operation to mill and pave between Wilderness Road and Black Meadow Road, along with milling and paving between Ely's Ford Road and Montpelier Drive.
Route 3 westbound
Monday-Friday, midnight-noon. Right lane closure between Taskforce Drive and Chewing Lane for construction.
Route 17
Monday-Friday, 9 a.m.-3 p.m. Traffic shift and shoulder closures between Hospital Boulevard and Massaponax Church Road for road construction under permit.
Route 17
Sunday-Thursday, 9 p.m.-5 a.m. and Monday-Friday, 9 a.m.-3:30 p.m. Guardrail work at various locations on Route 17 with a flagging crew directing traffic through the work zone.
Route 17
Sunday-Thursday, 8 p.m.-6 a.m. Mobile operation for milling and paving on Route 17 at various locations.
Route 208 (Lake Anna Parkway)
Sunday-Thursday, 8 p.m.-6 a.m. Mobile alternating lane closures along various spots on Route 208 for pavement marking.
Route 208 (Courthouse Road)
Monday-Friday, 9 a.m.-3:30 p.m. Guardrail work near Hunters Lodge with a flagging crew directing traffic through the work zone.
Route 608 (Massaponax Church Road)
Monday-Friday, 9 a.m.-3 p.m. One-way, alternating traffic directed by a flagging crew between Flippo Drive and Summit Crossing Road. Road construction under permit.
Route 610 (Old Plank Road)
Tuesday-Friday, 9 a.m.-3 p.m. Alternating lane closures between Gordon Road and Ziyad Drive for road widening work.
Route 612 (Catharpin Road)
Monday-Thursday, 7 a.m.-6 p.m. Road closed between Corbin Lane and Bluff Hill Way to replace drainage pipes.
Route 620 (Harrison Road)
Tuesday-Friday, 9 a.m.-3 p.m. and 7 p.m.-5 a.m. Alternating lane closures between Gordon Road and Old Plank Road for road widening work.
Route 627 (Gordon Road)
Tuesday-Friday, 9 a.m.-3 p.m. and 7 p.m.-5 a.m. Alternating lane closures between Legacy Woods and Old Plank Road for road widening work.
Route 738 (Partlow Road)
Monday-Thursday, 8:30 a.m.-7 p.m., and Friday, 8:30 a.m.-4 p.m. Pavement patching and trench widening. A flagging crew will direct alternating one-way traffic through the work zone between Route 606 (Morris Road) and Gatewood Road.
Route 2120 (Salem Fields Boulevard)
Monday-Thursday, 9 a.m.-7 p.m., and Friday, 9 a.m.-noon. Milling ahead of upcoming paving. A flagging crew will direct alternating one-way traffic through the work zone between Gordon Road and Rappahannock Drive.
Route 2121 (Rappahannock Drive)
Monday-Thursday, 9 a.m.-7 p.m., and Friday, 9 a.m.-noon. Pavement patching ahead of upcoming paving. A flagging crew will direct alternating one-way traffic through the work zone between Smith Station Road and Gordon Road.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 1 over Matta River
- Route 208 over I-95
- Route 607 over I-95
- Route 608 over I-95
- Route 620 over I-95
- Route 628 over I-95
- Route 646 over Matta River
- Route 656 over Ta River
- Route 719 over Lake Anna
- Route 738 over Ta River
Pavement marking
Monday-Friday, 9 a.m.-3:30 p.m. Mobile operation with alternating lane closures directed by a flagging crew along various secondary routes in Spotsylvania County.
Stafford County
Route 1
Monday-Thursday, 9 a.m.-3 p.m. Alternating lane closures on Route 1 northbound and southbound between Corporate Drive and Russell Road. Construction for bridge replacement at Chopawamsic Creek.
Route 1 northbound
Sunday-Thursday, 8 p.m.-6 a.m. Pavement marking. Alternating northbound lane closures between Hope Road and Coal Landing Road.
Route 3, Route 3 Business (Kings Highway), and Blue and Gray Parkway
Sunday-Thursday, 8 p.m.-6 a.m. and 9 a.m.-3:30 p.m. Alternating lane closures for pavement marking at various locations on Route 3, Blue and Gray Parkway, and Route 3 Business (Kings Highway) in the Ferry Farm area.
Route 607 (Deacon Road)
Monday-Friday, 9 a.m.-3 p.m. Single-lane closure for utility installation under permit between Woodlawn Terrace and Woodlawn Drive.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 3
- Route 17 over Deep Run
- Route 608 over Potomac Creek
- Route 626 over Potomac Creek
- Route 627 over I-95
- Route 627 over Route 1
- Route 652 over Falls Run
- Route 753 over I-95
Guardrail work
Sunday-Thursday, 9 p.m.-5 a.m., and Monday-Friday, 9 a.m.-3:30 p.m. Single-lane closures for guardrail work at various locations on the following routes:
- Route 1
- Route 3
- Route 17
- Route 207
- Route 301
- Route 608
- Route 627
- Route 1809
- Route 8900 (Centreport Parkway)
Westmoreland County
Route 347
Wednesday, 7 a.m.-7 p.m. Mobile operation to apply pavement markings near Route 3.
Bridge cleaning
Monday-Saturday, 7 p.m.-7 p.m. Mobile operation to clean and wash bridges to remove debris. Expect lane closures at the following locations:
- Route 3 over Popes Creek
- Route 3 over Chandlers Mill Pond
- Route 202 over Nomini Creek at Mount Holly
- Route 205 over Mattox Creek
- Route 205 over Rosier Creek
- Route 608 over Kinsale Creek
Additional projects in Fredericksburg District
City of Fredericksburg
Route 1 and Augustine Avenue intersection improvement
Project to improve safety and traffic operations on Route 1 between the Stafford Avenue and the College Avenue/Eagle Village Drive intersections will begin construction Wednesday, Sept. 23, and will continue through October 2027. Route 1 will remain open to traffic throughout the project, but construction will implement brief detours at various locations on intersecting side streets during various phases of construction, which will be announced in advance.
King George County
Route 301 at Commerce Drive/University Drive and Market Center intersection improvements in Dahlgren
Construction begins Tuesday, Sept. 22, 2026, to modify both intersections into signalized double restricted crossing U-turns (RCUT) to improve safety and operations. Project completion is expected in June 2027.
Gloucester County
Intersection improvements at Route 17 and Fox First Street
Intersection improvements at Route 17 and the Shoppes of Gloucester
Construction began in August 2026 to reconstruct the existing restricted crossing U-turns (RCUT) to better align with Fox First Street and the Shoppes at Gloucester. The crossovers are being modified to reduce the risk of crashes. Left turns out from side streets will continue to be prohibited. Project completion is expected in June 2027.
Gloucester County and Middlesex County
Route 17 northbound bridge replacement at Dragon Run
Bridge replacement is underway at the Route 17 northbound bridge over Dragon Run at the Gloucester County and Middlesex County line. The new bridge will be wider, taller and longer than the existing bridge, which was built in 1931. Route 17 northbound will remain reduced to a single lane at the bridge while crews construct crossovers for a traffic diversion to the Route 17 southbound bridge planned for summer 2026. Work zone barriers will continue to separate the left and right lanes of Route 17 northbound. The right lane closed in December 2025 after a vehicle crash damaged the bridge rail and guardrail. Project completion is expected in December 2027.
Lancaster County
Route 695 (Windmill Point Road) bridge replacement over Oyster Creek
Construction began in August 2026 to replace a bridge on Route 695 (Windmill Point Road) over Oyster Creek. The new bridge will continue to have two travel lanes, but each lane will be 11 feet wide, with 4-foot-wide shoulders on each side. The bridge rail will be 42 inches high. During fall 2026, Windmill Point Road traffic will begin to cross a temporary bridge for the remainder of the project. A temporary traffic signal will control one-way, alternating traffic through the work zone. Vehicles of all legal weights, up to 45 tons, can cross the temporary bridge during construction. The vehicle width restriction on the temporary bridge will be 13 feet, 7 inches. Once the temporary bridge is installed and open to traffic, the posted speed limit will be 25 mph in the work zone. Project completion is expected in May 2027.
Route 790 (Kamps Mill Road)
Route 790 (Kamps Mill Road) over Camps Millpond in Lancaster County has closed for motorist safety after a routine inspection of a culvert found deterioration. Motorists should use Route 3 as the recommended detour. The Virginia Department of Transportation will announce an estimated timeline to reopen the road to traffic once the emergency repair project schedule is finalized.
Northumberland County and Westmoreland County
Route 617 (Gardy's Mill Road)
Gardy's Mill Road is closed at Gardy's Millpond at the Northumberland and Westmoreland line with no reopening date. Gardy's Mill Road closed to through traffic for public safety in May 2025 due to a dam breach at the millpond. Water also damaged the road's travel surface. The Virginia Department of Transportation maintains the road, which runs on top of the dam maintained by the Virginia Department of Wildlife Resources. Travelers should use Route 202 (Hampton Hall Road) as a detour.
Richmond County
Route 360 at Route 624 (Newland Road) intersection improvements
Construction began in April 2026 on a $2.8 million project at the Route 360 and Newland Road intersection. The project is making several improvements to reduce the risk that vehicle paths will overlap at the intersection, resulting in a crash. The project is scheduled to be finished in September 2026.
Spotsylvania County
I-95 exit 126 area improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left-turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left-turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in September 2027.
Route 620 (Harrison Road) reconstruction and widening
Harrison Road is being widened to four lanes between Gordon Road and Old Plank Road. The project will build a center turn lane along Harrison Road and additional through travel lanes at the Old Plank Road and Gordon Road intersections, and extend the current turn lanes at these intersections. Sidewalks will be built along Harrison Road, and pedestrian crossing signal equipment and crosswalks will be added at the Old Plank Road and Gordon Road intersections. Project completion is expected in September 2026.
Stafford County
Route 1 bridge replacement at Chopawamsic Creek
Construction is underway on a $13.9 million project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases. Construction is expected to be complete in June 2028.
Route 1 at Telegraph Road and Woodstock Lane
Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left-turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left-turn lanes will be built from Telegraph Road onto Route 1 southbound. A left-turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion is expected in fall 2026.
Route 1 and Courthouse Road intersection improvement project
Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left-turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion is expected in summer 2027.
Route 644 (Rock Hill Church Road) bridge replacement
Route 644 (Rock Hill Church Road) is closed to replace the temporary single-lane structure over Aquia Creek with a two-lane bridge. Rock Hill Church Road will remain closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.
Commuting and ridesharing information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools and transit. Visit www.gwrideconnect.org or call (540) 373-7665.

