I-95 northbound and southbound
Exit 143 (Aquia/Garrisonville)
Monday–Friday, 9 p.m.-4:30 a.m. Varying single and double lane closures between mile markers 145-142 near the interchange. Installation of pavement edge rumble strips following recent paving.
Exit 104 (Carmel Church)
Monday–Thursday, 6 p.m.-7 a.m., and Friday–Saturday, 8 p.m.-8 a.m. Single lane closures at mile markers 102-105, near exit 104 (Carmel Church). Crews will be installing construction barrels and concrete barriers for a project to improve the condition of the northbound and southbound I-95 bridges over CSX Railroad.
I-95 southbound
Exit 148 (Quantico) to exit 118 (Thornburg)
Sunday–Friday, 7 p.m.-7 a.m. Mobile single lane closures at various locations on I-95 southbound between the interchanges to gather soil samples.
People are also reading…
Exit 130 (Route 3) to exit 126 (Spotsylvania)
Sunday–Thursday, 8 p.m.-5 a.m. Single lane closure between mile markers 128-126 for construction for exit 126 area improvements.
Thursday–Friday, 10 p.m.-5 a.m. Two lanes closed between mile markers 128-126 for overhead sign installation.
Caroline County
Route 301
Monday–Friday, 9 a.m.-3 p.m. Installation of pavement markers at various locations on Route 301. Mobile operation with alternating lane closures.
Guardrail work
Monday–Friday, 9 a.m.-3:30 p.m. Single lane closures for guardrail work at various locations on the following routes in Caroline:
- Route 1
- Route 17
- Route 207
- Route 301
City of Fredericksburg
Route 1 northbound and southbound
Sunday–Friday, 7 p.m.-6 a.m., and Monday–Friday, 9 a.m.-1:30 p.m. Alternating lane closures between Eagle Village Drive and Stafford Avenue for roadway reconstruction project.
Essex County
Route 17 (Tidewater Trail) southbound
Monday–Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation near Route 624.
Gloucester County
Route 17
Sunday–Thursday, 7 p.m.-5 a.m. Alternating lane closures between Main Street and Farys Mill Road, between Farys Mill Road and Meredith Drive, and between Belroi Road and Fiddlers Green Road. Application of pavement markings, and installation of inlaid pavement markers.
Route 17 northbound
Monday–Friday, 9 a.m.-3 p.m. Single lane closure for intersection improvement project between the intersection of The Shoppes of Gloucester and Main Street. The crossover and turn lanes at The Shoppes of Gloucester remain closed for crossover reconstruction through Sunday, Nov. 22.
Route 17 northbound and southbound
Sunday–Friday, northbound 9 p.m.-8 a.m. and southbound 6 p.m.-5 a.m. Single lane closure between Main Street and Beehive Drive. Construction for intersection improvements.
Route 17 (Main Street)
Monday–Friday, 9 a.m.-3 p.m. Single lane closure for intersection improvement project at the intersection of Route 17 and T.C. Walker Road.
Route 33
Sunday–Monday, 9 a.m.-3 p.m. Mobile operation with alternating lane closures for installation of inlaid pavement markers between the King and Queen County line and Route 17.
King George County
Route 3 eastbound
Monday–Friday, 9 a.m.-3:30 p.m. Single lane closure for guardrail installation near Forest Lane Road and Lambs Creek Church Road.
Route 218 (Caledon Road)
Monday–Friday, 9 a.m.-3:30 p.m. One-way, alternating traffic for guardrail installation at the intersection of Route 609.
Monday–Friday, 9 a.m.-3:30 p.m. One-way, alternating traffic for paving between Ridge Road and the Machodoc Creek bridge.
Route 301 northbound and southbound
Monday–Friday, 9 a.m.-3 p.m. Single lane closures for an intersection improvement project near University Drive.
Pavement markings
Monday–Friday, 9 a.m.-3:30 p.m. Mobile operation with alternating lane closures directed by a flagging crew to apply pavement markings on the following routes:
- Route 3
- Route 206
- Route 218
King William County
Route 30
Monday–Friday, 7 a.m.-7 p.m. Mobile lane closures between Olde Footpath Road and Upshaw Road. A flagging crew will direct one-way, alternating traffic. Application of pavement markings and installation of inlaid pavement markers.
Middlesex County
Route 227 over Urbanna Creek
Sunday–Thursday, 9 p.m.-5 a.m. Bridge maintenance. Single lane closure with one-way, alternating traffic directed by automatic flagging assistance devices.
Richmond County
Route 360 westbound
Monday–Friday, 7 a.m.-3:30 p.m. Single lane closure on Route 360 westbound between Threeway Road and Cole Hill Road. Slope and pipe repair.
Spotsylvania County
Route 1 northbound and southbound
Sunday–Thursday, 8 p.m.-5 a.m. Alternating northbound and southbound lane closures between the I-95 southbound ramp and Market Street for construction of I-95 exit 126 area improvements.
Route 3
Sunday–Thursday, 9 p.m.-5 a.m. Alternating lane closures at the bridge over Wilderness Run for repair.
Route 3 westbound
Monday–Tuesday, 10 p.m.-midnight, and Wednesday–Friday, 4 a.m.-noon. Single right lane closure on westbound Route 3 between Taskforce Drive and Chewning Lane for roadway reconstruction.
Route 17
Monday, 9 a.m.-3:30 p.m. Alternating lane closures for paving near the Benchmark Road intersection.
Route 626 (Andora Drive)
Monday–Friday, 8:30 a.m.-7 p.m. Pavement marking. A flagging crew will direct alternating one-way traffic through the work zone between Old Plank Road and Route 3.
Route 738 (Partlow Road)
Monday–Wednesday, 8:30 a.m.-7 p.m. Pavement markings. A flagging crew will direct alternating one-way traffic through the work zone between Morris Road and Gatewood Road.
Route 1671 (Warner Drive)
Monday–Thursday, 7 a.m.-4:30 p.m. Road closed to through traffic daily for pipe replacement. A detour route will be posted during work hours. The road will reopen nightly after daytime work concludes.
Guardrail work
Sunday–Thursday, 9 p.m.-6 a.m., and Monday–Friday, 9 a.m.-3:30 p.m. Mobile operation for guardrail work. Travelers may encounter lane closures at the following locations in Spotsylvania:
- Route 3
- Route 17
- Route 208
- Route 620 (Harrison Road)
- Route 620 (Spotswood Furnace Road)
- Falcon Drive
Kingswood subdivision
Monday–Friday, 9 a.m.-7 p.m. Mobile lane closures for pavement patching on multiple routes throughout the Kingswood subdivision.
Stafford County
Route 1
Monday–Friday, 9 a.m.-3 p.m. Alternating lane closures on Route 1 between Corporate Drive and Russell Road for a bridge replacement project over Chopawamsic Creek.
Route 630 (Courthouse Road)
Sunday, 8 a.m.-5 p.m. One-way, alternating traffic at the bridge over CSX Railroad, between Hamn Lane and Estep Lane. Bridge inspection.
Route 652 (Truslow Road)
Monday–Friday, 9 a.m.-3:30 p.m. Pavement markings. A flagging crew will direct alternating one-way traffic through the work zone between Route 1 and Enon Road.
Clearview Heights subdivision
Monday–Friday, 9 a.m.-7 p.m. Mobile lane closures for paving on multiple routes throughout the Clearview Heights subdivision.
Guardrail work
Sunday–Thursday, 9 p.m.-5 a.m., and Monday–Friday, 9 a.m.-3:30 p.m. Single lane closures for guardrail work at various locations on the following routes in Stafford:
- Route 1
- Route 3
- Route 608 (Brooke Road)
- Route 626 (Leeland Road)
- Route 627 (Mountain View Road)
- Route 630 (Courthouse Road)
- Route 1809 (Reservoir Road)
- Route 8900 (Centreport Parkway)
- Empress Alexandra Place
Westmoreland County
Route 3 (Kings Highway)
Monday–Friday, 9 a.m.-3:30 p.m. Pavement markings. Mobile operation between the King George County line and Oak Grove Road. Flaggers will alternate one-way traffic through the work zone.
Additional projects in Fredericksburg District
Caroline County
I-95 bridges over CSX Railroad major rehabilitation
Construction is starting in November 2026 to improve two Interstate 95 bridges over CSX Railroad. The structures are located at mile marker 103, just a mile south of exit 104 (Carmel Church). Work includes replacing the bridge decks and repairing bridge beams. Project completion is expected in May 2028.
City of Fredericksburg
Route 1 and Augustine Avenue intersection improvement
Construction is underway on a project to improve safety and traffic operations on Route 1 between the intersections of Stafford Avenue and College Avenue/Eagle Village Drive. Route 1 will remain open to traffic throughout the project, but construction will implement brief detours at various locations on intersecting side streets during various phases of construction. Project completion is expected in October 2027.
King George County
Route 301 at Commerce Drive/University Drive and Market Center intersection improvements in Dahlgren
Construction is underway to modify both intersections into a signalized double restricted crossing U-turns (RCUT) to improve safety and operations. Project completion is expected in June 2027.
Gloucester County
Intersection improvements at Route 17 and Fox First Street
Intersection improvements at Route 17 and The Shoppes of Gloucester
Construction began in August 2026 to reconstruct the existing restricted crossing U-turns (RCUT) to better align with Fox First Street and The Shoppes at Gloucester. The crossovers are being modified to reduce the risk of crashes. Left turns out from side streets will continue to be prohibited. Project completion is expected in June 2027.
Route 17 Business (Main Street) intersection improvements
Construction is underway through November 2027 to modify the intersections of Main Street at Route 628 (T.C. Walker Road) and Main Street at Route 1018 (Sutton Road) to enhance safety.
Gloucester County and Middlesex County
Route 17 northbound bridge replacement at Dragon Run
Bridge replacement is underway at the Route 17 northbound bridge over Dragon Run at the Gloucester County and Middlesex County line. The new bridge will be wider, taller and longer than the existing bridge, which was built in 1931. Route 17 northbound and southbound are reduced to a single travel lane and are using the southbound bridge to cross Dragon Run. The northbound bridge will remain closed until the end of the project, when the new bridge will open. Project completion is expected in January 2028.
Lancaster County
Route 695 (Windmill Point Road) bridge replacement over Oyster Creek
Construction is underway to replace a bridge on Route 695 (Windmill Point Road) over Oyster Creek. The new bridge will continue to have two travel lanes, but each lane will be 11 feet wide, with 4-foot-wide shoulders on each side. Starting on November 11, Windmill Point Road traffic will begin to cross a temporary bridge for the remainder of the project. A temporary traffic signal is controlling one-way, alternating traffic through the work zone. Vehicles of all legal weights, up to 45 tons, can cross the temporary bridge during construction. The vehicle width restriction on the temporary bridge will be 13 feet, 6 inches. A temporary work zone speed limit of 25 mph is in place in the work zone. Project completion is expected in May 2027.
Route 790 (Kamps Mill Road)
Route 790 (Kamps Mill Road) over Camps Millpond in Lancaster County has closed for motorist safety after a routine inspection of a culvert found deterioration. Motorists should use Route 3 as the recommended detour. The Virginia Department of Transportation will announce an estimated timeline to reopen the road to traffic once the emergency repair project schedule is finalized.
Northumberland County and Westmoreland County
Route 617 (Gardy's Mill Road)
Gardy's Mill Road is closed at Gardy's Millpond at the Northumberland and Westmoreland line with no reopening date. Gardy's Mill Road closed to through traffic for public safety in May 2025 due to a dam breach at the millpond. Water also damaged the road's travel surface. The Virginia Department of Transportation maintains the road, which runs on top of the dam maintained by the Virginia Department of Wildlife Resources. Travelers should use Route 202 (Hampton Hall Road) as a detour.
Spotsylvania County
I-95 exit 126 area improvements
Route 1 is being widened to six lanes near the I-95 exit 126 interchange. This will provide space to build a second left turn lane for Route 1 traffic entering I-95 northbound and southbound. An auxiliary lane will be built on I-95 northbound from the on-ramp to the Route 208 (Courthouse Road) overpass to help entering vehicles merge with interstate traffic. The I-95 northbound and southbound on-ramps will be widened to receive traffic from dual left turn lanes. Two noise barriers will be built along I-95 southbound. Project completion is expected in September 2027.
Stafford County
Route 1 bridge replacement at Chopawamsic Creek
Construction is underway on a project to replace the four-lane Route 1 bridge over Chopawamsic Creek. The bridge is located just south of the Prince William County line and is near Quantico Marine Corps Base. Four travel lanes will remain open at most times during construction, with periodic lane closures needed during off-peak times as traffic is shifted to complete the bridge construction in phases. Construction is expected to be complete in June 2028.
Route 1 at Telegraph Road and Woodstock Lane
Construction is underway to realign the intersection of Route 1 and Telegraph Road, and to widen Route 1 at Woodstock Lane to build a southbound left turn lane and to make access management improvements. New traffic signal equipment will be installed at Telegraph Road and dual left turn lanes will be built from Telegraph Road onto Route 1 southbound. A left turn lane is being built from Route 1 southbound into Woodstock Lane. At Woodstock Lane, a concrete median will be installed on Route 1 to restrict turning movements. Stafford County is locally administering this project. Project completion is in early spring 2027. Visit the county project page.
Route 1 and Courthouse Road intersection improvement project
Construction is underway to widen Route 1 and provide improvements at the intersection of Route 1 and Courthouse Road, and at the intersection of Route 1 and Bells Hill Road/Hope Road. Route 1 will be improved to have four lanes with a concrete median separating northbound and southbound traffic, with dedicated left turn lanes onto Courthouse Road, Bells Hill Road and Hope Road. Improvements will also be made on eastbound and westbound Courthouse Road approaching Route 1. An 8-foot-wide sidewalk will be installed along Route 1, with crosswalks. Stafford County is locally administering this project. Project completion is expected in summer 2027. Visit the county project page.
Route 644 (Rock Hill Church Road) bridge replacement
Route 644 (Rock Hill Church Road) is closed to replace the temporary single-lane structure over Aquia Creek with a two-lane bridge. Rock Hill Church Road will remain closed to through traffic between Dunbar Drive and Van Horn Lane with a detour in place until June 2027.
Commuting and ridesharing information
GWRideConnect is a free ridesharing information and matching service for the Fredericksburg area and is part of the George Washington Regional Commission.
Let GWRideConnect help you discover your commuting options, such as carpools, vanpools and transit. Visit www.gwrideconnect.org or call (540) 373-7665.